The station, originally built in 1913, has already seen major improvements since work began in the summer of 2016. With significant completion as of July 2018, the $24.6 million project includes: two hydraulic elevators to provide ADA access to the station, one for each of the station 10-car platforms; a…
In conjunction with the LIRR Modernization Program, upgrading the Port Jefferson station is important to accommodate a future increase in ridership. Enhancements to Port Jefferson station are a part of a broader LIRR initiative to strengthen the reliability and resiliency of LIRR infrastructure as well as support the growth and…
The revamp for the Port Jefferson waiting room station has commenced with the modernization of the station interior. The new interior floor has been installed in the station’s waiting room.
Enhancements to the Stewart Manor Station are underway, and the exterior lighting has been updated. A sequence of improvements are planned in the upcoming weeks as part of a broader MTA LIRR initiative to support the growth and development of Long Island.
The Metropolitan Transportation Authority (MTA) today announced that the work to upgrade the signal system in Harold Interlocking in Sunnyside, Queens, has been completed, providing an immediate benefit to Long Island Rail Road customers and clearing the way for the start of the final East Side Access construction contract to…
“I’m within five minutes of the Northern State or the Meadowbrook Parkway,” says Viscusi, president of the Carle Place Civic Association. “So, wherever I have to go workwise, I can easily jump on and off major roadways.” That centrally located convenience, along with a short commute to Penn Station from…
Construction is underway for the Deer Park station enhancements such as renovating sidewalks, ramps, and curbside improvements. Enhancements to the Deer Park Station are part of a broader LIRR initiative to strengthen the reliability and resiliency of LIRR infrastructure.
The revamped East Hampton station opened today. Riders can enjoy the climate-controlled waiting room, USB charging ports, new interior and exterior sensory lightings and other new permanent features.
The elimination of this street-level grade crossing will dramatically improve safety for both LIRR passengers and motorists. Traffic along this crossing will see vast improvements, as crossing gates currently can close roadways for up to approximately 30 minutes in a peak hour, contributing to significant congestion on local streets.
The revamp to the Wyandanch Station is underway, with the modernization of the stations interior. The beautiful and uniquely designed Terrazzo floor has been installed. Enhancements to the Wyandanch Station are part of the Double Track Project and a broader LIRR initiative to strengthen the reliability and resiliency of LIRR…