MANHATTAN WORK
1. Monument installation on the west side track of the Manhattan tunnels.
2. Track installation at the upper level crossover in the Manhattan tunnels.
QUEENS WORK
3. Installation of a 35-foot soldier pile for the B/C Approach Structure support of excavation.
4. Hand digging and extending conduits below ground for a switch in Harold Interlocking.
5. Burying cables along the trough line for the B/C Approach Structure.
6. Concrete forms to support a duct bank between tracks in the future Mid-day Storage Yard.
7. Placing flowfill to secure a soldier pile for the B/C Approach Structure support of excavation.
8. Sub-ballast installed east of Queens Boulevard.
For more information and photos of work at East Side Access, please visit the East Side Access project page on AModernLI.com – http://www.amodernli.com/project/east-side-access/.